This date difference calculator counts the days between two dates and shows the gap as years, months and days, as weeks and days, and as business days from Monday to Friday. A second box adds or subtracts any number of days from a date and tells you the date and weekday you land on.
How to use the date difference calculator
- Enter a Start date and an End date. If the end date is earlier, the calculator swaps them and tells you.
- Tick Include end date (add 1 day) if both the first and last day should count, for example for a hotel stay counted in days or a leave request that runs from Monday to Friday inclusive.
- Read the total number of days in the result panel, with the years, months and days breakdown underneath.
- Check the extra figures: Weeks and days, Business days (Mon–Fri), total months and total hours.
- To find a date in the future or past, use Add or subtract days. Pick a From date and type a number in Days to add. Put a minus sign in front to go backwards.
How it works
Each date is turned into a count of days since a fixed starting point, using UTC midnight. Working in UTC means daylight-saving changes never add or remove an hour, so a difference never comes out as 308.96 days.
Total days = end date − start date (plus 1 if you include the end date)
Weeks and days = total days ÷ 7, with the remainder shown as days.
The years, months and days figure counts whole calendar units, the way people say it: first full years, then full months, then the days left over. Because months run from 28 to 31 days, this breakdown is not a fixed multiple of the total days.
Business days count every Monday to Friday in the range. Each full week adds 5, and the leftover days are checked one by one. Public holidays are not removed, because they differ by country and region.
Example
From 1 January 2026 to 6 November 2026:
- Total: 309 days, not counting 6 November.
- Breakdown: 10 months and 5 days.
- Weeks and days: 44 weeks and 1 day.
- Business days: 221, because 1 January 2026 is a Thursday, so the extra day is a weekday.
Tick Include end date and the answer becomes 310 days, 10 months and 6 days, 44 weeks and 2 days, and 222 business days, since 6 November 2026 is a Friday.
For the add-days box, 90 days after Friday 6 November 2026 is Thursday 4 February 2027.
Should you include the end date?
It depends on what you are counting. The default, not including the end date, counts the nights or gaps between dates. That is how notice periods, loan terms and “days until” countdowns usually work. From Monday to Tuesday is 1 day.
Including the end date counts every calendar day you touch. That suits event lengths, leave requests and medication courses, where Monday to Tuesday means 2 days. If a contract or form gives a rule, follow that rule. When in doubt, work out both and see which one matches the example in the document.
If you need someone’s exact age rather than a gap between two events, the age calculator shows it with a birthday countdown.
Frequently asked questions
How many days are between two dates?
Enter both dates and the calculator shows the total in the result panel. By default it counts the days from the start date up to, but not including, the end date. Tick “Include end date” to add the last day.
Does the calculator count leap years?
Yes. Every 29 February between the two dates is counted, because the calculation uses real calendar dates rather than a fixed 365 days per year.
Are public holidays removed from business days?
No. Business days here are every Monday to Friday in the range. Subtract your local public holidays yourself, since they change by country, state and year.
How do I find a date 30 days from today?
Use the “Add or subtract days” box. Leave the From date as today, type 30 in “Days to add”, and read the resulting date and weekday. Type -30 to go back instead.
Can daylight saving time change the result?
No. The calculator works on whole calendar dates in UTC, so clock changes in spring and autumn do not affect the count. For converting times between places, try the time zone converter.